The formula behind it
sheets = [2(L+W)H − openings + ceiling?] ÷ sheet area × (1 + waste)- openings
- doors 1.8 m² and windows 1.5 m² each (typical) — counts are yours to set
- waste
- 10% default for cuts and breakage; complicated rooms want 15%
Drywall takeoff multiplies the wall perimeter by height, subtracts openings, optionally adds the ceiling, and divides by the sheet area — then adds waste, because sheets are cut to fit and offcuts rarely align with the next need. The screw and tape lines use trade rules of thumb (≈23 screws per m², ≈1.1 m tape per m²) so the order covers fastening too, not just boards.
How to use this calculator
- 1
Enter the room's length, width and wall height.
- 2
Count doors and windows; toggle the ceiling on if you're boarding it too.
- 3
Set the sheet size (1.2 × 2.4 m default) and waste %.
- 4
Press Calculate — sheets, screws and tape appear together.
Worked examples
Bedroom
4 × 4 m, 2.5 m high, 1 door + 2 windows, walls only: (35.2) ÷ 2.88 = 12.2 → 14 sheets with 10% waste.
With ceiling
Same room boarding the 16 m² ceiling → 17.8 sheets → 20 sheets.